4 Answers

Hi,

I wouldn't conclude that it is a scam simply because the contractor is requesting payment. However, paying almost the entire renovation cost before the carpentry works even begin is certainly something I would be cautious about.

My suggestion is to review the payment schedule in your signed renovation contract and clarify why such a substantial payment is required at this stage.

Ideally, payments should be tied to agreed work milestones rather than paying almost everything upfront.

If you are uncomfortable, seek clarification and consider obtaining independent advice before making further payments.

As real estate agents, renovation contracting is not our area of professional expertise. You may wish to consult CASE or an independent renovation professional for more specific guidance.

Hope you manage to resolve this smoothly.

Geryl Lim
 9278 7772  Read More
1
Silas Tan 陈敬良
Hi, the request alone does not establish a scam, but paying almost everything before the work is completed leaves you exposed if the contractor does not perform.

Ask what the payment covers and compare it with the signed schedule. Clarify whether fabrication has begun, what specifications you approved, and what evidence of progress can be provided. If it is a new demand outside the agreed terms, ask for the reason in writing rather than paying under pressure.

CASE recommends progressive payments linked to renovation milestones. Have any revised schedule agreed in writing, and check your contractual obligations before refusing a payment that is already due. If the explanation remains unsatisfactory, get independent advice from CASE or a lawyer before advancing more money.

Silas Tan | Huttons | TRIBE
Free property guides and calculators: https://tribesg.com Read More
0
Gan Eng Joo ONASSIS
**Do not pay almost full payment upfront. This is a major red flag in Singapore’s renovation industry and puts you at high risk of abandonment or poor workmanship.**

Even if the contractor is not an outright scammer, firms demanding 80%–95% before carpentry fabrication often suffer from severe cash-flow problems—using your deposit to finish older projects.

---

### 1. Standard Singapore Carpentry Payment Schedule

Reputable interior designers and direct carpenters follow a **progressive milestone schedule**:

* **10% – 20% Deposit:** Upon signing the contract and confirming 2D/3D elevation drawings.
* **30% – 40% Fabrication Stage:** Only *after* factory fabrication begins (request timestamped photos/videos of your carcasses being cut in their workshop, or visit the factory).
* **30% – 40% Delivery & Installation:** Upon delivery of carpentry carcasses and doors to your unit.
* **5% – 10% Final Retention:** Held back until full installation, soft-close hardware alignment, and defect rectification are completed.

---

### 2. Essential Protections Before Paying Any Tranche

1. **Verify Company Credentials:** Check the contractor's UEN on **ACRA BizFile** (ensure active status and check incorporation date), verify **HDB Registered Renovation Contractor** status (if renovating an HDB flat), and check **CaseTrust** accreditation.
2. **Insist on Milestone Clauses:** Put the progressive payment schedule in writing, explicitly tying each tranche to physical verification at your site or workshop.
3. **Pay Only to the Corporate Account:** Transfer funds strictly to the registered company bank account matching the contract—never to an individual salesperson’s or carpenter's personal PayNow.
4. **Walk Away If They Refuse:** If a contractor insists on near-full upfront payment and refuses milestone terms, walk away and engage another firm.

---

Gan Eng Joo Onassis 颜荣裕, REALTOR®

MSc BIT (Middlesex, UK); BBA (UniSA)

CEA Reg No: R021244C | Mobile: (+65) 8889 9918 

Email: onassis@sgagent.com

SGAgent.com | SGRealtor.com | SGCommercial.com | SGCBD.com

SGShowflat.com | SGNewLaunch.com

Integrated Services: SGCash.com | SGRepair.com | SGLegal.com

Social (Facebook & TikTok): @sgcommercial Read More
0
Hi,

1) It is uncommon to demand a full payment before starting of work.
2) In general, the contractor in Singapore will request for a 30% deposit to start their work, 40% after material delivered on site, 25% to start work, 5% after everything done.
3) The percentage might differ for different company. You may negotiate how it works according to your comfort level. The sequence and payment scheme is roughly similar.
4) Not necessary scam, but may be the company is too small to negotiate with their workers/sub-contractors.

All The Best!!!

I hope the above answers your main concerns. If you have more questions, please feel free to contact me at 9011*0636 or email ling.ck7@gmail.com for more information.
I'll be glad to assist.

Best regards
Ling CK
9011 * 0636
ling.ck7@gmail.com
https://www.linkedin.com/in/ckling/
https://agents.huttonsgroup.com/R056727F/ Read More
1

Still looking for answers?

Get answers from PropertyGuru experts in 24 hours

Previously Asked Questions